Skip to main content
projects_banner.jpg

LPG recovery plant KHORMOR /KURDISTAN.

Client: Crescent – Dana gas

Main Contractor: KAR GROUP.

Duration: June – oct.  2008.

  • Perform calibration activities for instruments in phase one (EPF) Including pressure, temperature, level transmitters ,indicators , pressure safety valves, pressure regulator valves, control valves and switches.(330 items).
  • Installation and testing instruments on site including control cables and pneumatic st.st. tubes and hookup requirements.