Client:Kar Group

Duration: Sep. 2009 – Jan. 2010.

  • Path planning and design for 17 km pipeline with diameter 24’’.
  • Installation and implementation of all welded joints of the pipelines.
  • Performed the NDT activities before, during, and after the welding processes.
  • Performed the cathodic protection for the pipeline.