Erbil refinery extend project – Kurdistan

Engineering inspection works for the second phase / Erbil Refinery

Project: Erbil expansion Refinery (Refinery 20 000 barrels per day) and (enhancing gasoline unit 8000 Barrels per day).

Client: Kar group for oil projects 

Period: October 2008 - June 2009.

Acts of QA, QC.

  • Preparation of WPS.
  • Post Weld Heat Treatments (about 500 welded joints) and issued certification of test.
  • Work PQR.
  • Performed Welders test.
  • Prepared PWHT Procedure.

Non-Destructive tests

  • Visual inspection.
  • Radiography inspection x-ray & ɣ ray (where the number of X-Ray Film was more than 4500 x-ray film).
  • Liquid Penetrant Test
  • Pressure test (Hydrostatic test & pneumatic test) for all pipes networks.
  • Issued the certification of (QA, QC & NDT) works of the entire project.
  • Post weld heat treatment for pipe networks which requires a heat.