Darke&scull,SICIM / Zubair Oil Field Development Project.
Client: Eni Iraq.
Contractor: Drake & Scull / SICIM
Subcontractor: Burj Alsama Company.
Duration: 20 August, 2013 – 31 December 2013.
- Carrying out post weld heat treatment (PWHT) for Zubair pipeline.
- The total no. of achieved joints is 450 joints with different sizes.