Bazian Refinery Expansion Projects / Storage Tanks Contract – Kurdistan

Client: Bazian Refinery

Duration: 28 June 2011 – 08 July 2012.

  • Overall design for 10 storage tanks with capacity of 89000 cubic meters with its piping networks and all accessories.
  • The pre-fabrication of steel plates and all manufactured parts in these tanks. The pre-fabrication process include plates cutting, rolling, chamfering, sand blasting, painting,….etc.
  • Supplying of all material and equipment such as steel plates, equipments, tank accessories, …etc.
  • Installation of 10 storage tanks with capacity of 89000 cubic meters, and the work finished in 8 july 2012.