AL Rumadi water treatment plant (May 2003 to Nov 2003)

Client: UNICEF 

Period: May – Dec 2003 

Rehabilitation of AL Rumadi Aljaded water treatment plant and installation new Underground 16inch ductile pipeline. 

  • installation test & commissioning of power transformer 630kVA 11/0.4 KV with HV& LV boards
  • Installation test & commissioning of main LV distribution board for the plant.
  • Installation of new MCC for pumps.
  • Swap manual valves of filter system with electrical valves with new control system.
  • Installation new lighting .small power& air-conditioning system
  • Installation & test of fire alarm system.